Project Description

200 MMSCFD Cryogenic Gas Facility – Nigeria

Multiple discipline Engineering and design (Civil/Structural, Process, Mechanical, Piping, Electrical, Instrumentation, Controls) for the balance of plant with a 200 MMSCFD UOP/Russel Cryo Facility and refrigeration unit. Balance of Plant equipment includes: Slug Catcher, Three Phase separations, TEG Dehydration System, two (2) 5,000 BPD NGL Stabilizer Skids with two (2) 8 MMSCFD Overhead Booster Compressors, Five (5) 48 MMSCFD Residue Gas Compressors, (2) 50,000 BBL NGL Storage Tanks, NGL Pipeline Pump Skid, With onsite power distribution (three (3) gas powered generators, one (1) backup diesel generator with storage tank), and utility equipment (instrument air system, fuel gas system, Flares, PDC/MCC).