Project Description
6,000 BPD Saltwater Disposal (SWD) Expansion – Wamsutter, Wyoming
Multiple discipline engineering and design (Civil/Structural, Process, Mechanical, Piping, Electrical, Instrumentation, Controls). Design included the installation of one (1) new H-pump for water injection and reconfiguration of the backpressure controls for both injection pumps. Scope of work also included conversion of one (1) oil tank to a water tank, putting two (2) separate tanks back in service for water, and piping rework for the new tank configuration.