Project Description

Standard Central Production Facility with Future Well Expansion – Permian Basin

Multiple discipline engineering and design (Civil/Structural, Process, Mechanical, Piping, Electrical, Instrumentation, Controls). Design included the standardization of prefabricated pipe/electrical racks with standard equipment and all future flowlines from other well pads. Equipment included 3-phase separators, HP 2-phase separator, three (3) Vapor Recovery Units (VRUs), gun barrel, oil, water, and slop tanks, two (2) oil pipeline LACT skid, three (3) water transfer pumps, HP flare, LP flare, and utility equipment (HP flare fuel gas scrubber, LP flare fuel gas scrubber, HP/LP Flare Knockout Drums, electrical PDC/MCC with transformer, containment sump pumps, and blow-cases).