Project Description

Phase 2 Expansion of Central Production Facility (PCF) – DJ Basin

Process, Civil/Structural, Piping, Electrical and Instrumentation engineering and design to support the installation of (12) additional oil storage tanks, (1) additional horizontal heater treater, (7) VRUs, (2) new Truck LACT Units, (1) new pipeline LACT Unit, (1) 3rd party Coldstream skid packages, (2) condensate storage bullets, (2) NGL storage bullets, (2) new truck load-out bays, (1) additional Power Distribution Center (PDC), integration of existing and new power and instrumentation wiring and panels.