Project Description

Well Pad Design – DJ Basin, Weld County

(3 wells, with expansion capability to 12 wells)

Multiple discipline engineering and design (Civil/Structural, Process, Mechanical, Piping, Electrical, Instrumentation, Controls).  Design included the installation of 3-phase separators, Vapor Recovery Tower (VRT), four (4) oil tanks, one (1) slop tank, five (5) water tanks, expansion capabilities to install another VRT and double the size of the liquid storage, oil LACT unit, Vapor Recovery Unit (VRU), gas lift metering building, gas lift heater, and utility equipment (instrument air skid, HP and LP ECD and Knockout Drums, and Sales gas metering).  Design also included the possibility for future Power Rack and Gas Lift Compression.